Format: Softcover
Product Overview

Designed to prepare those Building Code Act Practitioners who intend to challenge the On-Site Sewage Systems - 2012 Qualification Examination.

NOTE: ALL BCIN SELF-STUDY MANUALS ARE FINAL SALE - NO REFUNDS OR EXCHANGES!

George Brown College On-site Sewage Systems - 2012 Participant Manual

Total
$125.00

More About This Product

Description

NOTE: ALL BCIN SELF-STUDY MANUALS ARE FINAL SALE - NO REFUNDS OR EXCHANGES!

This overview manual largely deals with the requirements related to the on-site sewage systems regulated under the Building Code (systems with design capacity less than 10,000 Litres per day). The Code requirements related to these systems are found in Part 8 of the Code. The manual addresses the following areas;

  • The Building Code, Permits, responsibilities and the concept of septic systems
  • Site conditions, Test Pits and T-Times
  • Characteristics of Systems and Design Flows
  • Class 1, 2 and 3 Sewage Systems
  • Class 4 Sewage Systems
  • Class 5 Sewage Systems
  • Construction of On-Site Sewage Systems
  • Occupational Health and Safety, and
  • Evaluation of Malfunctioning Systems, Remedial Work and Change-Of-Use Procedures.
Table of Contents

PREFACE

MODULE 1 Initial Screening and Background
MODULE 2 Site Evaluation
MODULE 3 Sewage Systems: Characteristics and Design Flows
MODULE 4 Class 1, 2 and 3 Sewage Systems
MODULE 5 Class 4 Sewage Systems
MODULE 6 Class 5 Sewage Systems
MODULE 7 Construction
MODULE 8 Occupational Health and Safety
MODULE 9 Evaluation of Malfunctioning Systems, Remedial Work and Change-of-Use Procedures

ANSWERS

APPENDIX A Troubleshooting Guide for On-Site Systems
APPENDIX B Inspection After Backfilling Guide
APPENDIX C Glossary
APPENDIX D Metric/Imperial Conversions Sheet for Clearances 

Features
NOTE: ALL BCIN SELF-STUDY MANUALS ARE FINAL SALE - NO REFUNDS OR EXCHANGES!
About the Author

This course is based on the Building Code Act, S.O. 1992, C. 23 as amended to April 1, 2010 and the Ontario Building Code 2012 (O. Reg. 332/12).

This publication has been developed by George Brown College , based on Building Code course material previously developed by the Ontario Ministry of Municipal Affairs and Housing, under an Agreement between George Brown College and the Ministry.

This publication contains material that is copyrighted by the Queen’s printer for Ontario and is reproduced in this publication under a license agreement.
Copyright © 2013, Queen’s Printer for Ontario

NOTE: ALL BCIN SELF-STUDY MANUALS ARE FINAL SALE - NO REFUNDS OR EXCHANGES!

This overview manual largely deals with the requirements related to the on-site sewage systems regulated under the Building Code (systems with design capacity less than 10,000 Litres per day). The Code requirements related to these systems are found in Part 8 of the Code. The manual addresses the following areas;

  • The Building Code, Permits, responsibilities and the concept of septic systems
  • Site conditions, Test Pits and T-Times
  • Characteristics of Systems and Design Flows
  • Class 1, 2 and 3 Sewage Systems
  • Class 4 Sewage Systems
  • Class 5 Sewage Systems
  • Construction of On-Site Sewage Systems
  • Occupational Health and Safety, and
  • Evaluation of Malfunctioning Systems, Remedial Work and Change-Of-Use Procedures.